Drawdown

Billerica, MA

Equinix BO2 – Billerica

Equinix · Operating · 41 Alexander Road

Colocation facility operating continuously since 1998, originally built and operated by Verizon as "BOS1." Equinix acquired it in 2017 as part of a 29-data-center portfolio purchase from Verizon. One of the longer-operating facilities tracked on this site, with two decades of history before its current ownership.

Estimated water use

Estimate

11,92831,080 gal/day

16.8 MW × 7101850 gal/day/MW (closed_loop_chilled_water)

16.8 MW capacity: datacentermap.comclosed_loop_chilled_water cooling: datacentermap.com

Ratio source: Uptime Institute Journal

Low end derived from an indirect-evaporative (ExCool-style) system reported at ~260,000 gal/year for a 1 MW facility. High end derived from a direct-evaporative system reported to use 10% of a traditional chiller/cooling-tower system's water. Both figures are this site's own gal/day/MW conversion from the cited source, not quoted verbatim.

Derived from a published industry ratio; actual use varies with operating conditions, load, and weather.

Lifecycle timeline

Observed

Confirmed events only, each with its source.

  1. ~January 1998

    Construction completed

    The Billerica facility opens and operates for nearly two decades as a Verizon-owned data center before its 2017 sale.

    Source
  2. ~January 2017

    Ownership change

    Equinix acquires the Billerica facility along with 28 other data centers in a portfolio purchase from Verizon, renaming it BO2.

    Source

Observed hydrologic data

Observed

From nearby USGS and NOAA monitoring stations, refreshed monthly. Dashed lines mark lifecycle milestones.

Groundwater level (ft below surface)

2 stations, overlaid · monthly average

Regulatory records

Observed

Water permits and environmental compliance records from MassDEP WMA permits and decisions and EPA ECHO.

EQUINIXBILLERICA, MA

RCRA
No Violation Identified

0 inspections on record · 0 formal enforcement actions · full ECHO report ↗

EQUINIXBILLERICA, MA

0 inspections on record · 0 formal enforcement actions · full ECHO report ↗

Other water permits in Billerica: local context only

1 other WMA permit on file in Billerica, held by other water users nearby. The most recent:

  • Final Water Management Act Permit Amendment for Town of Billerica 12/16/2021Dec 16, 2021

Drawdown story

Assessment

Is the water table's behavior near this facility consistent with its estimated draw — and how strong is the evidence? A fixed rubric, recomputed monthly; every number below is stored with the inputs that produced it. Method: attribution-v1.

  1. 1 · Pathway

    The operator has not disclosed where this facility's water comes from. Until a source is published, the assessment is capped: an unclassified pathway can never raise the score.

  2. 2 · Detectability

    At the high end of the estimate, the expected signal at the nearest monitored well 1.1 mi away is marginal (~0.3 ft) and may be lost in noise.

  3. 3 · Signal

    Monthly median depth to water: wells within 2 mi of the facility (violet) vs. matched background wells 5–15 mi away (gray). Shading marks the assessment's baseline and post-anchor windows. ΔDiD = +1.42 ft (positive = decline near the facility relative to controls).

    Dashed: each near well's own trend, deseasonalized and projected forward from its last reading — a projection of measured history, not a prediction, and never part of the evidence score below. Method: forecast mode.

Too few comparable background wells to run a controlled comparison.

Attribution evidence score: withheld · as of 2026-07-22 · attribution-v1

Too few control wells
Pathway0/35
Detectability8/15
Temporal signal0/30
Robustness0/20